Google
Study on ATP/ATO function requirement specification for high speed rail that supports automatic operation. Page 2. Table 1. Table 2. Table 3.
... Study on ATP/ATO function requirement specification for high speed rail that supports automatic operation, Conference of the Korean Society for Railway, pp.
Sep 28, 2023The goal of the ATO effort is to produce interoperable standards which allow an ATO train developed by any railroad to operate on any railroad's territory.
Missing: ATP/ function
Jun 28, 2010This Technical Memorandum describes the functions within the ATC and its ATP, ATO, and ATS functional sets, describes the locations where the ...
Missing: Study | Show results with:Study
This paper proposes and assesses different possible ATO architecture configurations through allocating the intelligent components on the trackside or onboard.
Sep 19, 2024Automatic Train Operation (ATO) is a method of operating trains automatically where the driver is either not required at all or serves a ...
Missing: Study | Show results with:Study
The extracted system requirements will prepare the generation of high-speed railway ATO system test cases and system functional specifications. The research ...
May 24, 2024The ATP system aims to monitor the train's performance and speed and applies the brakes if approaching a stop signal or an unsafe scenario ...
Jan 12, 2024We have developed an ATO system based on ATS (Automatic Train Stop) -DK which is intermittent type ATP and equipped continuous speed check.
Jul 6, 2023ATO is a control system, both on-board and trackside, capable of autonomously managing the movement of the train, respecting the journey ...